Basement Drywall Installation in Oshawa
In an Oshawa basement, we usually hang the ceiling first, and then the wall sheets go up beneath it.
Or email patleroy6161@gmail.com
Ceiling sheets hung before the walls
Ceilings are usually hung before walls. That way, the wall sheets help carry the ceiling edges. The ceiling sheets go up, then the walls are boarded below them. We follow that order in a basement as we would on any floor.
Plans for an open basement ceiling
If your basement ceiling is still open, tell us what is planned for it when you get in touch. If your basement has a permit from the City of Oshawa, we hang to the approved drawings.
Oshawa is part of
Basement Drywall Installation in other areas
Basement Drywall Installation in Oshawa: questions
What has to be done before drywall goes up in a basement?
Board usually goes up after the framing is built and the plumbing, electrical and ductwork rough-ins are in. The insulation and vapour barrier also need to be installed. Hanging earlier would cover work that may still need changes or inspection.
Can you hang drywall before the vapour barrier is installed?
Board usually goes up after insulation and vapour barrier are in place. Where a building permit applies, that work may need inspection before it is covered. Where a permit applies, it may need inspection before the basement is boarded.
Do you hang the basement ceiling or the walls first?
Ceilings are usually hung before walls. That way the wall sheets help carry the edges of the ceiling board. The same order applies in a basement as on any other floor of the house.
What does an STC rating mean for a basement wall or ceiling?
STC rating is a common way to compare wall and ceiling assemblies for sound control. The number reflects the whole assembly, including board, layers, channel, insulation and sealing, rather than any single product.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.