P.L.R Drywall

Multi-Unit Drywall Installation

We hang drywall in multi-unit buildings, where walls and ceilings between units are often rated assemblies for fire and sound.

About this service

Between units, the drawings set the assembly: board type, layers, framing, fasteners and spacing. The rating depends on more than the board, so we hang each layer exactly as specified.

Common areas and stairwells add tall walls, hung from scaffold. We work to the builder's schedule, after rough-ins and insulation and before taping. Builders can tell us the number of units and floors, whether drawings and specs exist, and where the job is in the schedule.

What this covers

  • Hanging board on walls and ceilings between units, to the drawings
  • Fire-rated board hung exactly as the listed assembly specifies
  • Sound control assemblies with extra layers or resilient channel as specified
  • Stairwells and high ceilings in common areas, hung from scaffold or lifts
  • Hang scheduled by the builder between other trades, before taping

Multi-Unit Drywall Installation: questions

What does multi-unit drywall installation actually cover?

It covers hanging gypsum board in buildings with more than one unit. Sheets are cut, lifted and fastened to wall and ceiling framing with drywall screws, including the walls and ceilings that separate one unit from the next.

Does putting up fire-rated board make the wall fire-rated?

No. A fire-resistance rating belongs to the whole assembly: board, framing, fasteners, spacing and layers. That is why we hang the board exactly as the drawings and the listed assembly specify, not just the board type.

Can you hang board over resilient channel between units?

Yes, where the assembly calls for it. Resilient channel is one of the parts that can make up a sound control assembly. The board is hung to the assembly specified on the drawings.

How do you handle many units with the same layout?

Each unit is still laid out to keep joints few, with butt joints staggered rather than lined up. Where units repeat, the same layout logic carries from one unit to the next.

Does work behind the board need inspection before you close it in?

Where a building permit applies, the work before board, such as insulation and vapour barrier, may need inspection before it is covered. That is settled before hanging starts in each area.

Will mould-resistant board stop mould in the units?

Mold-resistant board uses a facing and core treated to resist mould growth. It does not make a space mould-proof. Moisture still has to be controlled in the building.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.