Mold-Resistant Drywall Installation
We hang mould-resistant drywall: board with a treated facing and core that resists mould growth, cut and fastened to your framing.
Or email patleroy6161@gmail.com
About this service
This board uses a facing, often fibreglass instead of paper, and a treated core. Both are made to resist mould growth.
It resists mould; it does not make a room mould-proof, so moisture in the space still has to be controlled. If you are choosing board for a basement or another damp area, tell us which rooms and surfaces should get it.
What this covers
- Hanging mould-resistant board on wall and ceiling framing
- Fastening with drywall screws set just below the face
- Laying out sheets to keep joints few and butt joints staggered
- Hanging to approved drawings where your project has a permit
- Basement work once framing, rough-ins, insulation and vapour barrier are in
Where we do mold-resistant drywall installation
Mold-Resistant Drywall Installation: questions
What is mould-resistant drywall?
Mould-resistant board uses a facing and a core treated to resist mould growth. The facing is often fibreglass instead of paper. We hang it to framing with drywall screws, the same way as other gypsum board.
Is mould-resistant drywall waterproof enough for a shower wall?
No. It resists mould growth, but it is not waterproof. Areas that get wet directly, such as shower walls, usually call for a different backer board. Tell us where water will reach the wall.
Does anything need inspection before the board covers it?
Where a building permit applies, the work before board, such as insulation and vapour barrier, may need inspection before it is covered. Let us know where your project stands so the hang fits that step.
Do you hang the ceiling or the walls first?
Ceilings are usually hung before walls. The wall sheets then help carry the ceiling edges. That order holds when a room needs mould-resistant board on both the ceiling and the walls.
As a builder, how does your hang fit our trade schedule?
On subcontract work, the builder or general contractor schedules the hang between other trades, usually after rough-ins and insulation and before taping. Tell us where mould-resistant board is specified on the job.
Can new mould-resistant board meet the old walls in our addition?
In a home addition, the new space is hung, and new board often has to meet existing walls or ceilings where the addition joins the house. Tell us where the new board meets the old.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.