P.L.R Drywall

Mold-Resistant Drywall Installation in Markham

Markham contractors should spec mould-resistant board knowing its limits: it resists growth, and the building still has to control moisture.

Resistant does not mean mould-proof

Mould-resistant board has a treated facing and core. It does not make a space mould-proof. On a Markham job, moisture still has to be controlled alongside the board. We hang it where your drawings show it.

Mould-resistant board after a Markham close-in

In new construction, hanging comes once the house is closed in and rough-ins and insulation are done. As a subcontractor, we fit between other trades, usually before taping. Board goes up to the drawings, with butt joints staggered and screws at the specified spacing.

What mold-resistant drywall installation covers →

Mold-Resistant Drywall Installation in other areas

Mold-Resistant Drywall Installation in Markham: questions

How do you lay out the sheets in a room?

Sheets are laid out to keep joints few, and butt joints are staggered rather than lined up. Fewer and better-placed joints make taping easier for whoever finishes the walls.

Does this service include taping and finishing?

No. This service covers hanging: cutting, lifting and fastening the board to framing. We install drywall only and do not tape, mud or finish; taping and finishing are done by others.

Can mould-resistant board be used in a sound-control wall?

Sound control comes from the whole assembly: denser or thicker board, extra layers, resilient channel, cavity insulation and acoustic sealant. If your specified assembly uses mould-resistant board, we hang it as specified.

Do I still need moisture control with mould-resistant board?

Yes. Mould-resistant board does not replace moisture control. It resists mould growth, but the space still needs its moisture kept in check. Plan for both when you choose board for a damp area.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.