Ceiling Drywall Installation in Markham
In Markham, we hang ceilings from a planned sheet layout so the taper inherits fewer joints and staggered butt ends.
Or email patleroy6161@gmail.com

Long sheets to cut the joint count
We set out each ceiling before fastening, using long sheets where the room allows. Fewer joints mean less taping. Fewer and better-placed joints make the finisher's work easier. Screw heads sit just below the paper face.
Staggered butt ends on long ceiling runs
Where sheet ends meet, the butt joints are staggered rather than lined up. In commercial interiors with steel stud framing, the board is fastened with screws made for steel studs. We hang ceilings for builders and general contractors in Markham, with over 20 years in the trade.
Ceiling Drywall Installation in other areas
Ceiling Drywall Installation in Markham: questions
When does the ceiling get hung on a new house?
On new construction, hanging starts once the house is closed in and the rough-ins and insulation are done. The ceilings are usually hung before the walls.
What has to be done before the ceiling board goes up?
Board usually goes up after framing, plumbing, electrical and ductwork rough-ins are in. Insulation and vapour barrier also go in before the board covers them.
Can you board a bulkhead that drops below the ceiling?
Yes. Bulkheads are framed boxes that hide ducts, pipes or beams, or drop a ceiling. The board is cut to fit each face of the box.
How are ceiling sheets fastened to the joists?
Ceiling sheets are fastened to the framing with drywall screws. Each screw is driven so its head sits just below the paper face, without tearing the paper.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.