Subcontract Drywall Services
We hang drywall as a subcontractor for builders and general contractors. The hang fits into your schedule between rough-ins and taping.
Or email patleroy6161@gmail.com

About this service
On a build, the hang usually comes after the plumbing, electrical and ductwork rough-ins and the insulation. It comes before taping. The general contractor sets that slot and has the framing ready for board. Where a permit applies, work behind the board may need inspection before it is covered.
Builders book us by calling (365) 499-0040, emailing patleroy6161@gmail.com or sending the form with drawings, specs and the stage the job is at. We hang to those drawings, including any rated assemblies for fire or sound. Sheets are laid out to keep joints fewer and better placed.
What this covers
- Hanging board between other trades on builder and contractor schedules
- Cutting, lifting and fastening board to wood or steel stud framing
- Hanging fire-rated and sound assemblies exactly as the drawings specify
- Layouts with few joints and staggered butt joints
- High ceilings, stairwells and skylight wells hung from scaffold
Where we do subcontract drywall services
Subcontract Drywall Services: questions
Where does drywall hanging fit in a builder's schedule?
The hang usually comes after framing, plumbing, electrical and ductwork rough-ins, and after insulation and vapour barrier are in. Taping comes after it. The builder or general contractor sets the date between other trades.
Can you hang fire-rated assemblies shown on our drawings?
Yes. A fire-resistance rating belongs to the whole assembly: board, framing, fasteners, spacing and layers. So fire-rated board, often 5/8 inch Type X, is hung exactly as the drawings and listed assembly specify.
Do you hang the ceilings or the walls first?
Ceilings are usually hung before walls. The wall sheets then help carry the ceiling edges. Wall sheets are cut and fastened to the framing below, with joints kept few and butt joints staggered.
Can you hang the high ceilings and stairwells on our project?
Yes. Our past work includes high, vaulted, sloped and coffered ceilings, stairwells, skylight wells and a two-storey window wall, hung from scaffold. Long sheets and careful layout matter more there, since joints show more under light.
Which board can we specify for damp rooms like bathrooms?
Moisture-resistant board suits damp rooms such as bathrooms and laundry rooms. It is not waterproof. Areas that get wet directly, such as shower walls, usually call for a different backer board.
How does a builder book P.L.R Drywall for a hang?
Builders book us by phone at (365) 499-0040, by email at patleroy6161@gmail.com or through the form. Tell us the job address, mention the drawings, and say where the project sits between rough-ins, insulation and taping. We then visit the site and quote there.
Related: hanging work
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.