Subcontract Drywall Services in Whitby
Once the board is up and fastened on your Whitby renovation, the taper takes over. Our part ends there.
Or email patleroy6161@gmail.com

Fewer joints to fill
We lay out sheets to keep joints few, and we stagger butt joints rather than lining them up. Fewer and better-placed joints make taping easier for whoever finishes the walls. That matters on renovation jobs in Whitby and Brooklin.
Where our scope stops and finishing starts
We do not tape, mud or finish, and we do not arrange the finisher. Taping and finishing are done by others. Our scope ends when the sheets are hung and the screw heads sit just below the paper face, without tearing it.
Within Whitby
Whitby is part of
Subcontract Drywall Services in other areas
Subcontract Drywall Services in Whitby: questions
Can you hang fire-rated assemblies shown on our drawings?
Yes. A fire-resistance rating belongs to the whole assembly: board, framing, fasteners, spacing and layers. So fire-rated board, often 5/8 inch Type X, is hung exactly as the drawings and listed assembly specify.
How do you handle sound-rated walls between units?
In multi-unit buildings, walls and ceilings between units are often rated for fire and sound. Sound control comes from the whole assembly, often compared by STC rating, so we hang the board to the assembly specified.
Can you hang the curved walls and arches on our drawings?
Yes. Curved walls use thin flexible board, often 1/4 inch, sometimes in two layers, or regular board scored or dampened so it can bend. Arches are lined with flexible board along the curved underside.
Do you hang basements for builders and homeowners?
Yes. In a basement, board goes up after the framing, rough-ins, insulation and vapour barrier are in. Where a permit applies, that work may need inspection before it is covered.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.