P.L.R Drywall

Basement Drywall Installation

We hang drywall in basements, on walls, ceilings and the bulkheads that box in ducts, pipes and beams.

About this service

In a basement, board goes up once the framing, rough-ins, insulation and vapour barrier are in. If your basement project has a permit, we hang to the approved drawings.

Basement ceilings often have bulkheads around ducts and beams. We cut board to fit each face of the box. For damp areas such as a laundry room or bathroom, you can ask for moisture-resistant or mould-resistant board. Sheets have to come down the stairs, so tell us about the stairway and any other way in. Let us know the room layout and the ceiling height.

What this covers

  • Basement walls hung after framing, rough-ins, insulation and vapour barrier
  • Basement ceilings, hung before walls so wall sheets carry the edges
  • Bulkheads and soffits boxing in ducts, pipes and beams
  • Moisture-resistant or mold-resistant board in damp rooms where specified
  • Partition walls boarded on both sides to divide basement space

Basement Drywall Installation: questions

What has to be done before drywall goes up in a basement?

Board usually goes up after the framing is built and the plumbing, electrical and ductwork rough-ins are in. The insulation and vapour barrier also need to be installed. Hanging earlier would cover work that may still need changes or inspection.

Do I need a permit to drywall my basement?

We cannot tell you when a permit is or is not required. That question goes to the local municipality that issues building permits for your address. When a basement project has a permit, the board goes up to the approved drawings.

Does the bulkhead need to be built before you arrive to board it?

A bulkhead is a framed box, so the framing has to be in place before board goes on. Once the box is framed, board is cut to fit each face and fastened with drywall screws.

Is moisture-resistant drywall okay for a basement shower?

No. Moisture-resistant board resists moisture but is not waterproof. Areas that get wet directly, such as shower walls, usually call for a different backer board. Moisture-resistant board suits the rest of a damp room.

Can a basement ceiling be boarded around low pipes and beams?

Beams and pipes that sit below the ceiling line are usually boxed in with framed bulkheads or soffits. The board is then cut to fit each face of those boxes, along with the flat ceiling around them.

How are the sheets laid out on basement walls and ceilings?

Sheets are laid out to keep joints few, and butt joints are staggered rather than lined up. Fewer and better-placed joints make taping easier for whoever handles that stage of the job.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.