P.L.R Drywall

Basement Drywall Installation in Clarington

For builders and contractors doing basements in Clarington, the hang fits into the schedule between the other trades.

Hang timing on subcontract work

On subcontract work, the builder or general contractor schedules the hang. It usually comes after the rough-ins and insulation and before taping. So the plumbing, electrical and ductwork rough-ins are finished first.

Coordinating with other trades and taping dates

When you call, tell us where the other trades are and when taping is planned. That helps line up the hang. If your basement has a permit from the Municipality of Clarington, we hang to the approved drawings.

What basement drywall installation covers →

Within Clarington

Clarington is part of

Basement Drywall Installation in other areas

Basement Drywall Installation in Clarington: questions

Does the bulkhead need to be built before you arrive to board it?

A bulkhead is a framed box, so the framing has to be in place before board goes on. Once the box is framed, board is cut to fit each face and fastened with drywall screws.

Can a bulkhead be used to drop part of a basement ceiling?

Yes. Bulkheads and soffits can hide ducts, pipes or beams, or they can drop a section of ceiling. In both cases the board is cut to fit each face of the framed box and fastened to it.

Can you board new partition walls for basement bedrooms or rooms?

Yes. A partition wall is a non-load-bearing wall that divides a space. It is usually boarded on both sides. Once the framing for the new wall is up, the sheets can be cut and fastened to it.

Does basement drywall installation include taping and finishing?

No. This service covers hanging: board cut, lifted and fastened to the framing. We install drywall only and do not tape, mud or finish; taping and finishing are done by others.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.