Framing, rough-ins, insulation and vapour barrier: in a Newcastle basement, these are in place before the first sheet of board goes up.

Framing, rough-ins and insulation before board

Before we hang a basement, the space needs to be ready for board. The framing has to be up. The plumbing, electrical and ductwork rough-ins need to be in. Insulation and vapour barrier come before the board as well.

Telling us which stages are finished

Once the board is up, all of that is behind it. So the order matters. When you get in touch, tell us which of these are done in your basement and which are still to come. Permits for Newcastle come from the Municipality of Clarington. If your project has one, we hang to the approved drawings.

What basement drywall installation covers →

Newcastle is part of

Basement Drywall Installation in other areas

Basement Drywall Installation in Newcastle: questions

Can a bulkhead be used to drop part of a basement ceiling?

Yes. Bulkheads and soffits can hide ducts, pipes or beams, or they can drop a section of ceiling. In both cases the board is cut to fit each face of the framed box and fastened to it.

Should I use moisture-resistant drywall in a basement bathroom?

Moisture-resistant board is made for damp rooms such as bathrooms. Its facing and core are made to resist moisture. It is not waterproof, so shower walls in that bathroom usually call for a different backer board.

How are the sheets laid out on basement walls and ceilings?

Sheets are laid out to keep joints few, and butt joints are staggered rather than lined up. Fewer and better-placed joints make taping easier for whoever handles that stage of the job.

As a contractor, when should I schedule the basement hang?

A builder or general contractor usually schedules the hang between other trades, after rough-ins and insulation and before taping. In a basement, that means after the vapour barrier is in and any required inspection is done.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.