Home Addition Drywall in Newcastle
Running a renovation in Newcastle? P.L.R Drywall hangs the addition when your other trades have finished their rough-ins.
Or email patleroy6161@gmail.com

Where the hang sits in your trade order
Board goes up once framing, plumbing, electrical and ductwork rough-ins are done, and insulation and vapour barrier are in. Ceilings go up before walls. Taping and finishing follow, done by others. We book the Newcastle hang into that gap.
Lining up with the general contractor
If a builder or general contractor runs the job, they schedule our hang between the other trades. A permit from the Municipality of Clarington may mean an inspection before board covers the insulation. We hang after it, to the approved drawings.
Newcastle is part of
Home Addition Drywall in other areas
Home Addition Drywall in Newcastle: questions
Our addition plan includes a curved wall. Is that something you hang?
Curved Wall & Archway Drywall is one of our services. Curved walls use thin flexible board, often 1/4 inch, sometimes in two layers. Regular board can also be scored or dampened so it bends.
Will you follow the permit drawings for our addition?
If your project has a permit from your municipality, we hang to the approved drawings. Screws go in at the spacing the board maker and the drawings call for, and board is hung as specified.
Do you stagger the joints on the addition walls?
Yes. Sheets are laid out to keep joints few, and butt joints are staggered rather than lined up. Fewer and better-placed joints make taping easier for whoever finishes the walls.
Our addition has a bulkhead hiding ductwork. Can you hang it?
Bulkheads and soffits are framed boxes that hide ducts, pipes or beams, or drop a ceiling. The board is cut to fit each face of the box before it is fastened.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.