Home Addition Drywall across Durham Region
Builders with additions in several towns across Durham Region can book P.L.R Drywall to hang board between trades.
Or email patleroy6161@gmail.com

Fitting the hang between rough-ins and taping
On an addition, the builder or general contractor schedules our hang after framing, rough-ins, insulation and vapour barrier, and before taping. We fit into that slot on each site, whether the job is in Oshawa, Ajax, Whitby, Pickering, Clarington, Bowmanville, Newcastle or Brooklin.
Each town issues its own permits
Building permits in Durham Region come from each local municipality, not the Region. Whichever town issued yours, we hang to the approved drawings for that addition. A Whitby job and a Pickering job each follow their own set.
Within Durham Region
Home Addition Drywall in other areas
Home Addition Drywall in Durham Region: questions
How do you handle the spot where the addition joins the old house?
New board often has to meet existing walls or ceilings at the join. The framing there may not be perfectly straight. Each sheet is cut and fitted to the framing that is actually there, not to an ideal line.
Are the ceilings or the walls hung first in an addition?
Ceilings are usually hung before walls. The wall sheets then help carry the ceiling edges. That order holds in an addition the same way it does in any other room of the house.
Do you hang fire-rated board where the addition drawings call for it?
Fire-rated board, often called Type X, has a core made with glass fibres and is commonly 5/8 inch thick. A rating belongs to the whole assembly, so we hang it exactly as the drawings and listed assembly specify.
Can the addition walls be built to keep noise down for an office?
Sound control comes from the whole assembly: denser or thicker board, extra layers, resilient channel, insulation in the cavity and acoustic sealant at gaps. We hang the board to the assembly specified.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.