P.L.R Drywall

Fire-Rated Drywall Installation across Durham Region

Across Durham Region, we hang Type X board where renovation drawings call for a fire-rated wall or ceiling.

Permits come from each town, not the Region

Oshawa, Ajax, Whitby, Pickering, Clarington, Bowmanville, Newcastle and Brooklin are all in Durham Region. Building permits come from the local municipality, not the Region. If your renovation has a permit from that municipality, we hang to its approved drawings.

Reading where rated board is marked

For contractors with renovation jobs in more than one Durham town, the drawings mark where a rated assembly goes. We hang Type X board only where they show it, and as the listed assembly specifies. In an existing house, that often means fitting new board beside old walls, on framing that may not be perfectly straight.

What fire-rated drywall installation covers →

Within Durham Region

Fire-Rated Drywall Installation in other areas

Fire-Rated Drywall Installation in Durham Region: questions

How thick is fire-rated drywall usually?

Fire-rated board is commonly 5/8 inch thick. The thickness your job needs is set by the drawings and the listed assembly, so we hang the board the drawings specify rather than picking a thickness ourselves.

Does fire-rated board make my wall fireproof?

No. Type X holds together longer in a fire than regular board. The fire-resistance rating belongs to the whole assembly, including framing, fasteners, spacing and layers, not to the board by itself.

When in the build does rated board go up?

Board usually goes up after framing, plumbing, electrical and ductwork rough-ins are done, and after insulation and vapour barrier are in. Rated board follows the same order as other board.

How do you lay out sheets on a rated wall?

We lay sheets out to keep joints few, and we stagger butt joints rather than lining them up. Fewer, better-placed joints make taping easier for whoever handles that stage.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.