P.L.R Drywall

Subcontract Drywall Services in North York

For builders and general contractors in North York, we take the hang slot after rough-ins and insulation, ahead of the tapers.

Sloped ceiling with three skylights and scaffold in the room

Steel stud interiors on commercial jobs

Commercial interiors often use steel stud framing. We fasten board with screws made for steel studs, at the spacing the drawings call for. That work fits in once the studs, rough-ins and insulation are done.

Rated walls between units in multi-unit builds

In multi-unit buildings in North York, walls and ceilings between units are often rated for fire and sound. Ceilings are hung first so the wall sheets carry their edges. We hang these after the cavity is insulated, built to the drawings, so the next trade can move in.

What subcontract drywall services covers →

North York is part of

Subcontract Drywall Services in other areas

Subcontract Drywall Services in North York: questions

What about additions that tie into the existing house?

On a home addition, the new space is hung, and new board often has to meet existing walls or ceilings where the addition joins the house. We fit the board to the framing at that join.

Where does drywall hanging fit in a builder's schedule?

The hang usually comes after framing, plumbing, electrical and ductwork rough-ins, and after insulation and vapour barrier are in. Taping comes after it. The builder or general contractor sets the date between other trades.

What is the difference between hanging and boarding?

There is none. Hanging, also called boarding, is fastening gypsum board sheets to wall and ceiling framing with drywall screws. On a subcontract job, that is the stage we are booked for.

Is mould-resistant board the same as mould-proof?

No. Mould-resistant board uses a facing, often fibreglass, and a core treated to resist mould growth. It does not make a space mould-proof. Moisture still has to be controlled.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.