High Ceiling & Stairwell Drywall in Markham
We hang drywall on high ceilings, stairwells and skylight wells in Markham, with joint placement planned for how the room is lit.
Or email patleroy6161@gmail.com

Skylight wells where joints catch the light
In a skylight well or under a vaulted ceiling, joints show more under light. They are also harder to reach up high. So we place them with care on every Markham job, working from scaffold or lifts.
Layout that keeps tape lines few
We lay out sheets to keep joints few, and we stagger butt joints. Screws go in with heads just below the paper face, at the spacing the board maker and drawings call for. That leaves fewer, better-placed joints for your finisher.
High Ceiling & Stairwell Drywall in other areas
High Ceiling & Stairwell Drywall in Markham: questions
When in a build should the tall areas be ready for board?
Board usually goes up after framing, plumbing, electrical and ductwork rough-ins are done, and insulation and vapour barrier are in. That applies to high ceilings and stairwells the same as any other room.
Does insulation need inspecting before high ceilings are boarded?
Where a building permit applies, the work before board, such as insulation and vapour barrier, may need inspection before it is covered. That should be done before we hang the high areas.
We want a quieter great room. Does the board alone control sound?
No. Sound control comes from the whole assembly: denser or thicker board, extra layers, resilient channel, cavity insulation and acoustic sealant at gaps. Assemblies are compared by STC rating, and the board is hung to the one specified.
As a builder, can I have you hang just the tall areas?
On subcontract work, a builder or general contractor schedules the hang between other trades, usually after rough-ins and insulation and before taping. Tell us which areas of the house you need hung.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.