High Ceiling & Stairwell Drywall in Scarborough
Send us the details of the tall room or stairwell on your Scarborough site, and we will set up a visit to quote.
Or email patleroy6161@gmail.com

Room details that shape the hang
Tell us if the space has a vaulted, sloped or coffered ceiling, a skylight well, a two-storey window wall or a stairwell. Say whether the framing is steel stud or wood, since steel studs take screws made for them. These spaces are hung from scaffold or lifts.
Where the trades stand before we arrive
Let us know if rough-ins, insulation and vapour barrier are in. Board goes up after those. On your Scarborough job, we then quote on site once we have seen the room.
Scarborough is part of
High Ceiling & Stairwell Drywall in other areas
High Ceiling & Stairwell Drywall in Scarborough: questions
Does insulation need inspecting before high ceilings are boarded?
Where a building permit applies, the work before board, such as insulation and vapour barrier, may need inspection before it is covered. That should be done before we hang the high areas.
How are screws set on a ceiling hung overhead from scaffold?
Screws are driven so the head sits just below the paper face without tearing it. They go in at the spacing the board maker and the drawings call for, whether the ceiling is low or high.
In new construction, when are high ceilings and stairwells hung?
Hanging comes once the house is closed in and the rough-ins and insulation are done. High ceilings and stairwells are hung in the same stage, with scaffold set up for the tall areas.
We opened a room up to a vaulted ceiling. Can you board it?
Yes. Renovation work often means hanging new board next to existing walls and ceilings. The new board on the vaulted ceiling is fitted where it meets the old surfaces.
More drywall services in Scarborough
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.