Mold-Resistant Drywall Installation in Toronto
For Toronto builders and general contractors, here is how mould-resistant board differs from standard gypsum board when we hang it.
Or email patleroy6161@gmail.com
Mould treatment in both face and core
The facing, often fibreglass instead of paper, and the core are treated to resist mould growth. On Toronto jobs, including Scarborough and North York, it still fastens to framing with drywall screws. On steel studs we use screws made for steel. Heads sit just below the face.
Separate from moisture-resistant and backer board
Moisture-resistant board is a different product for damp rooms. Wet areas such as shower walls usually take a different backer board again. We hang whichever board the drawings call for in each area, laid out to keep joints few.
Within Toronto
Mold-Resistant Drywall Installation in other areas
Mold-Resistant Drywall Installation in Toronto: questions
Do you hang the ceiling or the walls first?
Ceilings are usually hung before walls. The wall sheets then help carry the ceiling edges. That order holds when a room needs mould-resistant board on both the ceiling and the walls.
How do you lay out the sheets in a room?
Sheets are laid out to keep joints few, and butt joints are staggered rather than lined up. Fewer and better-placed joints make taping easier for whoever finishes the walls.
Can you hang mould-resistant board in a stairwell or high ceiling?
High ceilings and stairwells are hung from scaffold or lifts. Long sheets and careful layout matter more there, since joints are harder to reach and show more under light. Tell us the ceiling height.
Where is your company based and how do I reach you?
P.L.R Drywall is based at 319 French St, Oshawa, ON L1G 5N4. You can reach us by phone or through the form on this page, and we also have a Facebook page.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.