Mold-Resistant Drywall Installation in Ajax
In Ajax renovations, mould-resistant board works alongside moisture control, not in place of it, and we hang it where you plan it.
Or email patleroy6161@gmail.com
Controlling damp before the board goes up
Mould-resistant board has a facing, often fibreglass instead of paper, and a core treated to resist mould growth. It does not make a room mould-proof. Moisture still has to be controlled, so deal with the source in your Ajax renovation before we hang.
Insulation and vapour barrier ahead of the hang
In an existing house, board usually goes up after the insulation and vapour barrier are in. Have those in place first. Then we fasten the sheets to the framing, cutting them to fit next to the walls and ceilings already there.
Ajax is part of
Mold-Resistant Drywall Installation in other areas
Mold-Resistant Drywall Installation in Ajax: questions
How is mould-resistant board different from regular drywall?
Regular board has a paper face. Mould-resistant board has a facing, often fibreglass instead of paper, and a core treated to resist mould growth. Both are fastened to framing with drywall screws when hung.
Is mould-resistant drywall waterproof enough for a shower wall?
No. It resists mould growth, but it is not waterproof. Areas that get wet directly, such as shower walls, usually call for a different backer board. Tell us where water will reach the wall.
When does mould-resistant board go up in a new house?
In new construction, hanging comes once the house is closed in and rough-ins and insulation are done. Mould-resistant board goes up at that stage, hung to the drawings where they specify it.
Can mould-resistant board be part of a rated wall between units?
In multi-unit buildings, walls and ceilings between units are often rated assemblies for fire and sound, built to the drawings. If mould-resistant board is part of an assembly, we hang it exactly as the drawings show.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.