P.L.R Drywall

Mold-Resistant Drywall Installation in Brooklin

Pair mould-resistant board with good moisture control in your Brooklin home; we hang the board, and the damp needs handling too.

Board and moisture control work together

Mould-resistant board resists mould growth, but moisture still has to be controlled. In a bathroom or laundry room in Brooklin, that means dealing with the damp as well as choosing the board. Moisture-resistant board is made for those damp rooms, but it is not waterproof.

Leaving shower walls to backer board

Shower walls get wet directly, so they usually call for a different backer board. We hang the mould-resistant sheets on the surrounding walls and ceiling, with butt joints staggered so taping goes easier for whoever finishes them.

What mold-resistant drywall installation covers →

Brooklin is part of

Mold-Resistant Drywall Installation in other areas

Mold-Resistant Drywall Installation in Brooklin: questions

How are the screws set in mould-resistant board?

Screws are driven so the head sits just below the face without tearing it, at the spacing the board maker and the drawings call for. Each sheet is fastened into the framing with drywall screws.

Do you hang the ceiling or the walls first?

Ceilings are usually hung before walls. The wall sheets then help carry the ceiling edges. That order holds when a room needs mould-resistant board on both the ceiling and the walls.

Can mould-resistant board go on the wall between my garage and house?

In an attached garage, the wall and ceiling between the garage and the house are usually subject to building code requirements. Board there is hung as the permit drawings specify, so check what they call for.

How much hanging experience does your company have?

We have over 20 years in the trade hanging drywall. Our past work includes high, vaulted, sloped and coffered ceilings, stairwells, skylight wells, and a two-storey window wall hung from scaffold.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.