Multi-Unit Drywall Installation in Pickering
For renovators in Pickering, we fit the board hang into your schedule between the other trades on a multi-unit conversion.
Or email patleroy6161@gmail.com
Pickering multi-unit rough-ins before board
Board goes up once framing, plumbing, electrical and ductwork rough-ins are done, and insulation and vapour barrier are in. Where a permit applies, that work may need inspection before it is covered. If your permit is from the City of Pickering, we hang to the approved drawings.
Leaving the board ready s
A builder or contractor usually schedules the hang after insulation and before taping. Our part ends when the board is up and fastened, with screw heads set just below the paper face. Your tapers can then start on joints kept few and staggered.
Pickering is part of
Multi-Unit Drywall Installation in other areas
Multi-Unit Drywall Installation in Pickering: questions
How do you cut down noise travelling between units?
Sound control comes from the whole assembly. That can mean denser or thicker board, extra layers, resilient channel, insulation in the cavity, and sealing gaps with acoustic sealant. We hang the board to the assembly specified.
What is an STC rating on the drawings?
STC is a rating used to compare how well wall and ceiling assemblies control sound. It applies to the whole assembly, not one sheet of board. We hang to the assembly the drawings call for.
What about common areas with high ceilings?
High ceilings are hung from scaffold or lifts. Our past work includes high, vaulted and sloped ceilings hung from scaffold. Long sheets and careful layout help keep joints few where they show under light.
Will mould-resistant board stop mould in the units?
Mold-resistant board uses a facing and core treated to resist mould growth. It does not make a space mould-proof. Moisture still has to be controlled in the building.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.