Renovation Drywall in Scarborough
Adding or changing a room in your Scarborough home means new drywall has to sit beside walls you already have. We hang it.
Or email patleroy6161@gmail.com

Where a new wall meets an old ceiling
When new board goes up next to your existing walls and ceilings, the join needs care. Ceilings are hung first, so the wall sheets help carry the ceiling edges. We fit each sheet to the framing behind it, which may not be perfectly straight.
Screws set below the paper face
In your Scarborough home, each sheet is fastened with drywall screws. The heads sit just below the paper face without tearing it. They go in at the spacing the board maker calls for. Butt joints are staggered rather than lined up.
Renovation Drywall in Scarborough: questions
Do you only hang drywall, or is taping included?
No, taping is not included. We hang drywall only: board cut, lifted and fastened to framing. Taping and finishing are done by others, after the hang.
How do you lay out sheets so joints are easier to tape later?
Sheets are laid out to keep joints few, and butt joints are staggered rather than lined up. Fewer and better-placed joints make taping easier for whoever finishes the walls.
Is renovation drywall different from drywall for a home addition?
A home addition is new space that is hung, with new board meeting existing walls or ceilings where it joins the house. A renovation works within existing rooms, often next to walls that stay.
Is the ceiling or the wall hung first in a renovated room?
Ceilings are usually hung before walls. That way the wall sheets help carry the ceiling edges, which matters when new board is going up in a room that is being redone.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.