Residential Drywall Installation in Markham
Markham renovators can bring us in for one room or a full house of new board, fitted to the framing already there.
Or email patleroy6161@gmail.com

Hanging a single renovated room
When one room is redone, new board is hung next to existing walls and ceilings. Framing in a Markham renovation may not be perfectly straight, so each sheet is fitted as it goes up.
Planning joints across every room
On a whole-house job, we lay out sheets to keep joints few and stagger the butt joints. Ceilings in each room are hung before the walls. Insulation and vapour barrier should be in first. We visit before we quote, so we can see how much of the house is ready.
Residential Drywall Installation in other areas
Residential Drywall Installation in Markham: questions
What has to be done before you arrive to hang?
The framing, plumbing, electrical and ductwork rough-ins should be in, along with insulation and vapour barrier. Board usually goes up after all of those, so the walls and ceilings can be closed.
Does insulation need an inspection before drywall covers it?
Where a building permit applies, the work before board, such as insulation and vapour barrier, may need inspection before it is covered. If your project has a permit, we hang to the approved drawings.
Why does joint placement matter if the walls get taped anyway?
Sheets are laid out to keep joints few, and butt joints are staggered rather than lined up. Fewer, better-placed joints make taping easier for whoever finishes the walls.
What about coffered ceilings in a dining room or family room?
Our past work includes coffered ceilings. Each face of the framed boxes needs board cut to fit it.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.