P.L.R Drywall

Drywall Installation in Ajax

In Ajax, our part of your project sits in the middle: after the rough-ins and insulation, before anyone tapes a joint.

Two P.L.R Drywall installers in branded shirts hanging board on a sloped ceiling

Plumbing, wiring and ducts in first

Board goes up once the framing, plumbing, electrical and ductwork rough-ins are in, along with insulation and vapour barrier. After that, those cavities are covered. Ceilings go up before walls, so the wall sheets help carry the ceiling edges.

Handing the walls over to your taper

Taping and finishing come next, and others do them. We do not tape, mud or finish. Our part of your Ajax job ends when the board is up and fastened. We lay out sheets to keep joints few and stagger the butt joints. That makes taping easier for whoever finishes the walls.

What drywall installation covers →

Ajax is part of

Drywall Installation in other areas

Drywall Installation in Ajax: questions

Does my insulation need inspection before the board goes up?

Where a building permit applies, the work before board, such as insulation and vapour barrier, may need inspection before it is covered. Check with the municipality that issued your permit before we hang.

How do I ask for a quote on drywall installation?

Quotes are given on site. Call (365) 499-0040, email patleroy6161@gmail.com or send the form on this page to set up a visit. Tell us about the rooms, the ceiling heights and where the job is in the building process.

Can you hang drywall on steel studs?

Commercial interiors often use steel stud framing. On steel studs, the board is fastened with screws made for steel studs. Commercial drywall installation is one of our services.

What is fire-rated drywall?

Fire-rated board, often called Type X, has a core with glass fibres that holds together longer in a fire than regular board. It is commonly 5/8 inch thick and is hung as the drawings and listed assembly specify.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.