Drywall Boarding in Ajax
In your Ajax home, we start each room overhead: the ceiling board goes up first, and the walls follow.
Or email patleroy6161@gmail.com

Why the ceiling sheets go up first
Ceilings are usually hung before walls. The wall sheets then go up under the ceiling edges and help carry them. It is a simple order, and it is the one we follow in Ajax.
Fastening Ajax ceiling and wall boarding firmly
On the ceiling and on the walls, each screw is driven so its head sits just below the paper face. It should not tear the paper. Screws go in at the spacing the board maker and the drawings call for. That holds each sheet firmly to the framing.
Drywall Boarding in Ajax: questions
Why do you board the ceilings before the walls?
Ceilings are usually hung first. The wall sheets then go up underneath and help carry the ceiling edges. It is the normal order when walls and ceilings in the same room are being boarded.
What has to be finished before boarding can start?
Board usually goes up after framing is done and plumbing, electrical and ductwork rough-ins are in. Insulation and vapour barrier also need to be in place before the board covers them.
When can a basement be boarded?
In a basement, board goes up after the framing, rough-ins, insulation and vapour barrier are in. Basement Drywall Installation is one of the services we offer as well.
What board should go up in a bathroom?
Moisture-resistant board is used in damp rooms such as bathrooms and laundry rooms. It is not waterproof. Shower walls and other areas that get wet directly usually call for a different backer board.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.