New Construction Drywall in Ajax
Vaulted and cathedral ceilings in Ajax new builds get hung from scaffold, with long sheets laid out to keep joints few.
Or email patleroy6161@gmail.com

Long sheets on sloped ceiling planes
On a vaulted ceiling, joints are harder to reach and show more under light. Long sheets and careful layout matter more up there. We stagger butt joints rather than lining them up, which gives your taper fewer seams to chase.
Hanging tall rooms from scaffold or lifts
We hang high and vaulted ceilings, skylight wells and two-storey window walls from scaffold. Ceilings go up before walls on these jobs too. If your project has a permit from the Town of Ajax, we work to the approved drawings.
Ajax is part of
New Construction Drywall in other areas
New Construction Drywall in Ajax: questions
Can you hang vaulted or cathedral ceilings in a new build?
Yes. Our past work includes houses with high, vaulted and sloped ceilings hung from scaffold. Long sheets and careful layout matter more there, because joints are harder to reach and show more under light.
Who decides when the drywall hang happens on a builder's job?
On builder jobs, the builder or general contractor schedules the hang between the other trades. It usually falls after the rough-ins and insulation are done and before taping starts on the walls and ceilings.
Is board fastened differently on steel stud framing?
Yes. Commercial interiors often use steel stud framing, and board on steel studs is fastened with screws made for steel studs. The screw heads are still set just below the face without tearing it.
How is board fitted to bulkheads in a new house?
Bulkheads and soffits are framed boxes that hide ducts, pipes or beams, or drop a ceiling. The board is cut to fit each face of the box and fastened to that framing.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.