New Construction Drywall in Clarington
Renovating a house in Clarington and adding new space? We hang the board once the new part is ready for it.
Or email patleroy6161@gmail.com

Where an addition joins the house
On an addition, the new space is hung and the new board often has to meet existing walls or ceilings where it joins the house. Framing in a renovation may not be perfectly straight. We fit the board to what is there.
What has to be in before we arrive
Board goes up after framing, plumbing, electrical and ductwork rough-ins are done, and after insulation and vapour barrier. That holds in Bowmanville, Newcastle and the rest of Clarington. If the Municipality of Clarington approved your drawings, we hang to them.
Within Clarington
Clarington is part of
New Construction Drywall in other areas
New Construction Drywall in Clarington: questions
Are ceilings or walls hung first in a new house?
Ceilings are usually hung before walls. That way the wall sheets help carry the ceiling edges where the two meet. It is the usual order on a new build, starting overhead and then moving to the walls.
How do you keep the number of drywall joints down?
Sheets are laid out to keep joints few, and butt joints are staggered rather than lined up. Fewer and better-placed joints make taping easier for whoever finishes the walls.
Do you hang drywall in new multi-unit buildings?
Yes, multi-unit work is one of the services we offer. In these buildings, walls and ceilings between units are often rated assemblies for fire and sound, built to the drawings and hung as specified.
Can I book just the hang and arrange taping myself?
Yes. We install drywall only, so taping is always arranged separately. Hang-only drywall has its own page that sets out where our scope ends.
More drywall services in Clarington
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.