New Construction Drywall in Bowmanville
On Bowmanville new builds, our part ends when the board is up and fastened, ready for your taping crew.
Or email patleroy6161@gmail.com

Joint layout that helps the taper
Taping comes after us and is done by others. We lay sheets out to keep joints few, and we stagger butt joints rather than line them up. Fewer, better-placed joints make taping easier for whoever finishes the walls in Bowmanville.
Bowmanville new build screw depth and spacing
Each screw is driven so the head sits just below the paper face without tearing it. Spacing follows the board maker and the drawings. Ceilings go up before walls. With a Municipality of Clarington permit, we hang to the approved drawings.
Bowmanville is part of
New Construction Drywall in other areas
New Construction Drywall in Bowmanville: questions
What happens to the walls after the drywall is hung?
Taping and finishing come after hanging and are done by others; we do not tape, mud or finish. Fewer and better-placed joints make taping easier for whoever finishes the walls, so the sheet layout during the hang matters.
Are ceilings or walls hung first in a new house?
Ceilings are usually hung before walls. That way the wall sheets help carry the ceiling edges where the two meet. It is the usual order on a new build, starting overhead and then moving to the walls.
How is board fitted to bulkheads in a new house?
Bulkheads and soffits are framed boxes that hide ducts, pipes or beams, or drop a ceiling. The board is cut to fit each face of the box and fastened to that framing.
I am a builder. Can you hang as a subcontractor?
Yes. Subcontract drywall is one of the services we offer. The hang fits between the other trades, usually after rough-ins and insulation are done and before taping.
More drywall services in Bowmanville
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.