P.L.R Drywall

New Construction Drywall in Whitby

Builders in Whitby schedule the hang between other trades. We fit in after rough-ins and insulation, and before the tapers arrive.

Cathedral ceiling boarded with open framing beyond and scaffold below

Your trade schedule sets our start

On a subcontract job, the builder or general contractor decides when the hang happens. We hang ceilings first, so wall sheets help carry the edges. Tell us where your Whitby site sits in the sequence and book an on-site quote with us.

Brooklin sites under the same permit office

Brooklin is part of the Town of Whitby, so permits for both come from the same place. If the Town of Whitby issued your permit, we hang to the approved drawings. Butt joints are staggered so your taper has an easier job when they follow us.

What new construction drywall covers →

Within Whitby

Whitby is part of

New Construction Drywall in other areas

New Construction Drywall in Whitby: questions

Who decides when the drywall hang happens on a builder's job?

On builder jobs, the builder or general contractor schedules the hang between the other trades. It usually falls after the rough-ins and insulation are done and before taping starts on the walls and ceilings.

Do you hang the board to the permit drawings?

If your project has a permit, we hang to the approved drawings. Screws go in at the spacing the board maker and the drawings call for, and rated assemblies are hung as the drawings specify.

Can you hang coffered ceilings in a new house?

Our past work includes houses with coffered ceilings hung from scaffold. On high ceilings like these, careful layout matters because joints are harder to reach and show more under light once the room is lit.

Do you hang drywall in new multi-unit buildings?

Yes, multi-unit work is one of the services we offer. In these buildings, walls and ceilings between units are often rated assemblies for fire and sound, built to the drawings and hung as specified.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.