Drywall Boarding across Durham Region
Across Durham Region, in towns like Ajax, Whitby and Clarington, we hang board only once the house is ready to be covered.
Or email patleroy6161@gmail.com

Rough-ins finished before the first sheet
Board goes up after the framing is done. The plumbing, electrical and ductwork rough-ins need to be in too. Once a wall is covered, what sits behind it is hard to reach.
Insulation and vapour barrier in place
Insulation and vapour barrier also go in before we start. This order is the same in every Durham Region town we work in, from Oshawa and Pickering to Bowmanville, Newcastle and Brooklin. When those steps are done, we can hang the ceilings and walls.
Within Durham Region
Drywall Boarding in other areas
Drywall Boarding in Durham Region: questions
Is boarding the same thing as hanging drywall?
Yes. Boarding and hanging are two names for the same step. Sheets of gypsum board are fastened to the framing with drywall screws, before any taping or finishing starts on the walls.
Why do you board the ceilings before the walls?
Ceilings are usually hung first. The wall sheets then go up underneath and help carry the ceiling edges. It is the normal order when walls and ceilings in the same room are being boarded.
Can you board a renovation next to old walls?
Yes. Renovation work often means hanging new board next to existing walls and ceilings. It also means fitting the board to framing that may not be perfectly straight.
Can you board over steel stud framing?
Yes. Commercial interiors often use steel stud framing. Board is fastened to steel studs with screws made for steel studs rather than the screws used on wood framing.
More drywall services in Durham Region
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.