Drywall Boarding in Brooklin
Ceiling first, walls second: that is the order we hang in on Brooklin sites, so the wall board helps carry the ceiling edges.
Or email patleroy6161@gmail.com

Wall sheets carrying the ceiling edges
We hang the ceilings before the walls. The top row of wall sheets then goes up under the ceiling board and helps carry its edges. On a Brooklin build, that order holds for every room.
Staggered butt joints across the ceiling
On a ceiling, we lay sheets out to keep joints few. Butt joints are staggered rather than lined up. That gives whoever tapes after us fewer, better-placed joints to work on overhead. High or vaulted ceilings go up from scaffold or lifts.
Brooklin is part of
Drywall Boarding in other areas
Drywall Boarding in Brooklin: questions
How do you lay out the sheets on a wall?
Sheets are laid out to keep joints few. Butt joints are staggered rather than lined up. Fewer and better-placed joints make taping easier for whoever finishes the walls afterward.
What is a staggered butt joint in boarding?
A butt joint is where two sheet ends meet. Staggering means those joints do not line up from one row of sheets to the next. Board is laid out that way rather than in a straight line.
Will boarding alone make my wall soundproof?
No. Sound control comes from the whole assembly: denser or thicker board, extra layers, resilient channel, insulation in the cavity and acoustic sealant at gaps. The board is hung to the assembly specified.
Does a partition wall get boarded on both sides?
Usually, yes. A partition wall is a non-load-bearing wall that divides a space. It is normally boarded on both sides, so each room it separates gets a boarded face.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.