Drywall Boarding in Scarborough
In a Scarborough renovation, the hang slots in after the rough-ins and insulation, and before taping starts.
Or email patleroy6161@gmail.com

Booking the hang after the rough-ins
Plan the hang for when the framing, rough-ins, insulation and vapour barrier are in. If you run a Scarborough renovation, that sits between your electrician or plumber and the taping.
Ceiling-first order in a renovated room
Renovation work often means new board next to existing walls and ceilings. We hang the ceilings first, then the walls, and fit the sheets to framing that may not be perfectly straight. When the board is fastened, the room is ready for the next trade on your list.
Drywall Boarding in Scarborough: questions
How long have you been boarding drywall?
We have over 20 years in the trade. We hang drywall, with board cut, lifted and fastened to framing, including high, vaulted, sloped and coffered ceilings in houses.
What happens on site after the boarding is done?
After hanging comes taping and finishing. The board has to be up and fastened before that stage begins. Fewer, well-placed joints from boarding make the taping easier.
Does a partition wall get boarded on both sides?
Usually, yes. A partition wall is a non-load-bearing wall that divides a space. It is normally boarded on both sides, so each room it separates gets a boarded face.
Can you board a renovation next to old walls?
Yes. Renovation work often means hanging new board next to existing walls and ceilings. It also means fitting the board to framing that may not be perfectly straight.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.