P.L.R Drywall

Drywall Installation in Brooklin

On Brooklin builds, we come in once the rough-ins and insulation are done and leave the board fastened for the taping crew.

Two P.L.R Drywall installers in branded shirts hanging board on a sloped ceiling

Scheduling Brooklin drywall installation after vapour barrier

A builder or general contractor schedules the hang between other trades, usually after rough-ins and insulation and before taping. Book us for your Brooklin job once the vapour barrier is in and the mechanical trades are done in those rooms.

Screw depth and joint layout

Our work ends when the board is up and fastened. Others do the taping and finishing. Screws are driven just below the paper face without tearing it, at the spacing the board maker and the drawings call for. Staggered butt joints and few seams leave less work for the finisher.

What drywall installation covers →

Brooklin is part of

Drywall Installation in other areas

Drywall Installation in Brooklin: questions

Do you hang stairwells and two-storey walls?

Yes. Our past work includes stairwells, skylight wells and a two-storey window wall, hung from scaffold. Work at that height is done from scaffold or lifts so the sheets can be placed and fastened.

Do you take on whole houses or just single rooms?

Our services include residential, new construction, renovation, basement and home addition work, so the job can be a single room or a full house. Tell us the scope when you get in touch.

How do you hang walls between units in a multi-unit building?

Walls and ceilings between units are often rated assemblies for fire and sound. They are built to the drawings, and we hang the board to match what those drawings call for.

Will you hang drywall in my basement?

Yes, basement drywall installation is one of our services. In a basement, board goes up after the framing, rough-ins, insulation and vapour barrier are in place.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.