Drywall Installation in Oshawa
We hang drywall in Oshawa homes, from the first ceiling sheet to the last wall, fastened to your framing and ready for the next trade.
Or email patleroy6161@gmail.com

Rough-ins and insulation done before we start
Board goes up after the framing, plumbing, electrical and ductwork rough-ins are in. Insulation and vapour barrier should be in too. Once the board is fastened, those walls are closed. In Oshawa, we check this when we visit your home to quote.
Bathroom and laundry walls planned ahead
Damp rooms such as bathrooms and laundry rooms usually get moisture-resistant board. It resists moisture but is not waterproof. Shower walls that get wet directly usually call for a different backer board. Sort this out before the hang, so the right board goes on each wall.
Drywall Installation in Oshawa: questions
What does drywall installation include?
We cut gypsum board, lift it and fasten it to wall and ceiling framing with drywall screws. Ceilings usually go up first, so the wall sheets help carry the ceiling edges.
What needs to be done before you hang drywall?
Framing should be complete, and plumbing, electrical and ductwork rough-ins should be in. Insulation and vapour barrier also go in before board, because once the sheets are up those parts are covered.
Can you install new drywall next to old walls in a renovation?
Renovation work often means hanging new board next to existing walls and ceilings. The new board also has to be fitted to framing that may not be perfectly straight.
What kind of board goes in a bathroom or laundry room?
Moisture-resistant board is used in damp rooms such as bathrooms and laundry rooms. It is not waterproof. Areas that get wet directly, such as shower walls, usually call for a different backer board.
More drywall services in Oshawa
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.