Hang-Only Drywall Services in Toronto
Renovating a Toronto house? We hang the new board next to your existing walls and ceilings, and the work stops at the screws.
Or email patleroy6161@gmail.com

Fitting new board beside old walls
Renovation work often means hanging new board next to existing walls and ceilings, and fitting it to framing that may not be perfectly straight. In a Toronto renovation, including in Scarborough and North York, we cut each sheet to suit what is there.
What stays with you or other trades
You or others supply the board. Framing, insulation, demolition and repair are not part of our work, and neither are taping, mudding or finishing. Our scope ends when the board is up and fastened. The next trade picks up from there.
Within Toronto
Hang-Only Drywall Services in other areas
Hang-Only Drywall Services in Toronto: questions
What needs to be done before you arrive to hang?
Board usually goes up after the framing and the plumbing, electrical and ductwork rough-ins are done, and the insulation and vapour barrier are in. Those should be complete in the area we are hanging.
Does insulation need an inspection before the board goes up?
Where a building permit applies, the work before board, such as insulation and vapour barrier, may need inspection before it is covered. If your project has a permit, we hang to the approved drawings.
Do you hang walls between units in multi-unit buildings?
Yes. Walls and ceilings between units are often rated assemblies for fire and sound, built to the drawings. We hang the board to those drawings. Taping is arranged separately.
What should I tell you when asking about a hang-only job?
Tell us the rooms, ceiling heights and board types, and mention any drawings. Say that it is hang-only and who is booked for taping. That keeps the scope clear from the start.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.