P.L.R Drywall

Residential Drywall Installation in Toronto

We hang drywall for renovators in Toronto, in houses still lived in and in new space being added to existing homes.

Open stair and mezzanine with walls and ceilings boarded

Hanging while owners still live there

In a lived-in Toronto house, new board usually meets existing walls and ceilings. Framing in existing rooms may not be perfectly straight, so sheets are fitted to it. Each screw head sits just below the paper face.

Toronto addition board joining existing rooms

For an addition, we hang the new space once it is closed in and the rough-ins and insulation are done. New board often has to meet existing walls or ceilings where the addition joins the house. Scarborough and North York jobs are part of Toronto too.

What residential drywall installation covers →

Within Toronto

Residential Drywall Installation in other areas

Residential Drywall Installation in Toronto: questions

Can you work around my general contractor's schedule?

On many jobs, a builder or general contractor schedules the hang between other trades, usually after rough-ins and insulation and before taping. Your contractor can reach us by phone or through the form.

What has to be done before you arrive to hang?

The framing, plumbing, electrical and ductwork rough-ins should be in, along with insulation and vapour barrier. Board usually goes up after all of those, so the walls and ceilings can be closed.

Why does the ceiling get hung before the walls?

Ceilings are usually hung first, so the wall sheets help carry the ceiling edges. Once the ceiling board is up and fastened, the walls go up below it, sheet by sheet.

Can curved walls or arches in a house be boarded?

Curved walls use thin flexible board, often 1/4 inch, sometimes in two layers, or regular board scored or dampened so it bends. Arches are lined with flexible board along the curved underside.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.