Moisture-Resistant Drywall Installation in Brooklin
Your bathroom ceiling in Brooklin can get moisture-resistant board too. We hang it overhead before the wall sheets go on.
Or email patleroy6161@gmail.com
Why the bathroom ceiling goes up first
Ceilings are usually hung before walls. The wall sheets then help carry the ceiling edges. In a damp room such as a bathroom, we hang moisture-resistant board on the ceiling as well as the walls.
Screws set just under the ceiling face
On a Brooklin bathroom ceiling, each screw is driven so the head sits just below the face without tearing it. Spacing follows what the board maker and the drawings call for. Sheets are laid out to keep joints few overhead.
Brooklin is part of
Moisture-Resistant Drywall Installation in other areas
Moisture-Resistant Drywall Installation in Brooklin: questions
When does the board go up during a bathroom renovation?
Board usually goes up after the framing, plumbing, electrical and ductwork rough-ins are done. Insulation and vapour barrier also need to be in first. That order applies to moisture-resistant board as well.
Does the work behind the board need inspecting before you hang?
Where a building permit applies, the work before board, such as insulation and vapour barrier, may need inspection before it is covered. If your project has a permit, we hang to the approved drawings.
How long has P.L.R Drywall been hanging board?
P.L.R Drywall has over 20 years in the trade. We hang drywall, including moisture-resistant board, in damp rooms. Board is cut, lifted and fastened to the framing.
Where does moisture-resistant board stop and shower backer board start?
Shower walls get wet directly and usually call for a different backer board. The drier walls and the ceiling of the bathroom can take moisture-resistant board. Check your drawings for where each one goes.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.