Ceiling Drywall Installation in Newcastle
On Newcastle builds, schedule the ceiling hang ahead of the walls. We board ceilings first, then walls, after rough-ins and insulation.
Or email patleroy6161@gmail.com

Ceiling edges carried by the wall board
We hang the ceiling before any wall sheets. The wall board then goes up tight beneath it and helps carry the ceiling edges. It is the usual order on a hang, and we keep to it on every site.
Slotting the hang between other trades
As a subcontractor, we fit in where you schedule us. That is after framing, plumbing, electrical and ductwork rough-ins, insulation and vapour barrier, and before taping. We hang ceilings for builders and general contractors in Newcastle, with over 20 years in the trade.
Newcastle is part of
Ceiling Drywall Installation in other areas
Ceiling Drywall Installation in Newcastle: questions
Why use long sheets on a high ceiling?
Long sheets mean fewer joints. On high ceilings, joints are harder to reach and show more under light. Fewer joints make the work easier for whoever tapes afterward.
Can you put a new ceiling in a room with old walls?
Yes. Renovation work often means hanging new board next to existing walls and ceilings. The new ceiling board is fitted to meet what is already there.
How are ceilings between units in a multi-unit building handled?
Ceilings between units are often rated assemblies for both fire and sound. They are built to the drawings, and the board is hung exactly as those drawings and the assembly call for.
Can you board a bulkhead that drops below the ceiling?
Yes. Bulkheads are framed boxes that hide ducts, pipes or beams, or drop a ceiling. The board is cut to fit each face of the box.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.