Commercial Drywall Installation in Newcastle
Renovating a house in Newcastle with steel stud walls? We hang the new board on that framing with screws made for steel studs.
Or email patleroy6161@gmail.com
New board meeting existing walls
Renovation work often means hanging new board next to existing walls and ceilings. The framing may not be perfectly straight, so we fit each sheet to what is there and keep the joints few.
Setting screw heads on steel studs
On steel framing we drive screws made for steel studs. Each head sits just below the paper face without tearing it, at the spacing the board maker and the drawings call for. If your Newcastle renovation has a Municipality of Clarington permit, we hang to the approved drawings.
Newcastle is part of
Commercial Drywall Installation in other areas
Commercial Drywall Installation in Newcastle: questions
How do you handle sound control between tenant spaces?
Sound control comes from the whole assembly: denser or thicker board, extra layers, resilient channel, cavity insulation and acoustic sealant at gaps. We hang the board to the assembly specified.
What does an STC rating on the drawings mean?
STC is a rating used to compare how wall and ceiling assemblies control sound. The rating comes from the full assembly, so the board has to be hung the way that assembly is specified.
I own a small shop. Can you hang drywall for my renovation?
Yes. Renovation work often means hanging new board next to existing walls and ceilings, and fitting it to framing that may not be perfectly straight.
How long has P.L.R Drywall been hanging board?
We have over 20 years in the trade. Our work includes high, vaulted and sloped ceilings, stairwells and tall window walls hung from scaffold, as well as commercial walls and ceilings.
More drywall services in Newcastle
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.