P.L.R Drywall

New Construction Drywall in North York

Building a new house in North York? Here is where drywall hanging falls in the build, and what needs to be in first.

Cathedral ceiling boarded with open framing beyond and scaffold below

What your house needs before the board

Framing comes first. Then the plumbing, electrical and ductwork rough-ins go in, followed by insulation and vapour barrier. Where your North York build has a City of Toronto permit, that work may need inspection before it is covered, and we hang to the approved drawings.

Why the taper comes after us

Once the sheets are up, taping and finishing follow, done by others. We lay out sheets to keep joints few and hang ceilings before walls. Your builder or general contractor usually books us between those trades.

What new construction drywall covers →

North York is part of

New Construction Drywall in other areas

New Construction Drywall in North York: questions

What board goes in new bathrooms and laundry rooms?

Moisture-resistant board is used in damp rooms such as bathrooms and laundry rooms. It is not waterproof. Areas that get wet directly, such as shower walls, usually call for a different backer board.

When does drywall go up in a new house?

Hanging comes once the house is closed in, the framing, plumbing, electrical and ductwork rough-ins are done, and insulation and vapour barrier are in. Board goes on after that work, not before it.

Where is P.L.R Drywall based?

We are based in Oshawa, at 319 French St, Oshawa, ON L1G 5N4. The areas we serve are listed on this site, and those are the only areas where we hang drywall.

Is board fastened differently on steel stud framing?

Yes. Commercial interiors often use steel stud framing, and board on steel studs is fastened with screws made for steel studs. The screw heads are still set just below the face without tearing it.

Book an on-site quote

Calling is fastest:

(365) 499-0040

Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.

We install the drywall only. The board is supplied by others, and taping and finishing are done by others.

Phone or email, at least one.