Board after rough-ins and the vapour barrier
In a new build, board goes up after framing, plumbing, electrical and ductwork rough-ins are in. Insulation and vapour barrier come first too. If your project has a permit from the City of Oshawa, the work before board may need inspection before it is covered.
Oshawa new build ceilings hung before walls
We hang ceilings first, so the wall sheets help carry the ceiling edges. Sheets are laid out to keep joints few, with butt joints staggered. That makes taping easier for whoever comes in after us on your Oshawa site.
Oshawa is part of
New Construction Drywall in other areas
New Construction Drywall in Oshawa: questions
When does drywall go up in a new house?
Hanging comes once the house is closed in, the framing, plumbing, electrical and ductwork rough-ins are done, and insulation and vapour barrier are in. Board goes on after that work, not before it.
Does insulation need an inspection before the board covers it?
Where a building permit applies, work that the board will cover, such as insulation and vapour barrier, may need inspection before it is covered. The board goes up after that work is in place.
Does mould-resistant board make a new room mould-proof?
No. Mould-resistant board uses a facing, often fibreglass instead of paper, and a core treated to resist mould growth. It does not make a space mould-proof. Moisture in the room still has to be controlled.
Can you hang coffered ceilings in a new house?
Our past work includes houses with coffered ceilings hung from scaffold. On high ceilings like these, careful layout matters because joints are harder to reach and show more under light once the room is lit.
Book an on-site quote
Calling is fastest:
(365) 499-0040Email: patleroy6161@gmail.com
Or send the form with the rooms, ceiling heights and timing. Quotes are given on site, so we will arrange a visit.
We install the drywall only. The board is supplied by others, and taping and finishing are done by others.